Streetscaping

K2RQ Alliance, Blamey Street, Revesby

Construction of new kerb and Gutter, Paving works, landscaping works,
drainage works and Asphalt works
Project sum $ 1.7m
Duration 4 weeks

Belmore Road, Randwick

This job involved demolition of existing pavements, placement of reinforced concrete base and placement of 300 x 600 concrete pavers on sand/cement bedding. This also involved the installation of street furniture.

Price: $ 950,000.00
Duration: 3.5 weeks – November 2010

Grosvenor Lane, Cremorne

This project involved the demolition of Kerb and Gutter, pavements and all street furniture. Works comprised of installation of kerb and gutter, 225 diameter drainage line, electrical conduits, installation of street lights, new paving , asphalting and raised thresholds.

Price: $510,000.00
Duration: 2 weeks – June 2010

Drainage

Bay Road, Waverton

This project involved the installation of 120m of 375 diameter pipe at 1.7m deep with surface inlet and junction pits. The ground conditions were rock and shale. There was 500m2 of road resheet, landscaping and concrete works.

Price: $210,000.00
Duration: 1.5 weeks – October 2010

Concrete works

Cremorne Reserve, Cremorne Point

This project involved new kerb and gutter, footpath 130mm thick reinforced,Concrete steeps, drainage and landscaping. The footpath was 1200m long x 2.4m wide. 70% of the path was inaccessible to vehicles. All works comprised of all terrain vehicles and mini excavators.

Price: $910,000.00
Duration: 4 weeks – October 2009

Rock face stabilisation

Clarke Road, Neutral Bay

This project involved the clearing of 35t of debris and vegetation, installation of rock bolts 1.5m into rock, placement of F82 mesh and shotcreting. The face has been environmentally finished to blend in with the existing surrounds. All works by hand.

Price: $129,000.00
Duration: 1 week – August 2009

Sandstone retaining walls

Rowlingson Pde, Cammeray

This involved the removal of the existing sandstone blocks, clearing of fill 400mm behind wall, relaying of sandstone blocks with 8:1 no fines behind wall and landscape works.

Price: $35,000.00
Duration: 2 Days – June 2010

Civil

Willoughby Road, Crowsnest

This project involved the laying of 300 diameter pipe with all down pipe connections and pits. The existing road was cleaned and joint sealed. Pavers on sand bedding was laid on the existing road.

Price: $410,000.00
Duration: 2 weeks – June 2008